Smaller scope
Heating-system modernization only, with the capital requirement determined by the building.
Economics / One operating asset
GI finances the on-site heating infrastructure. The public institution pays a recurring heating fee. GI carries the operating cost and retains the difference as gross profit. With a 25-year customer contract, the economics depend on both the initial investment and the duration of the recurring cash flow.
01 / Approved reference case
This is the investment reference used in the economic model. It is not a fixed project price or a customer invoice. Actual capital requirements vary materially with retrofit scope.
Annual asset economics
Payback and contract duration
Approved representative figures. Individual projects do not necessarily carry the same fee, gross profit or payback period.
02 / Annual fee, cost and gross profit
The reference case separates what the customer pays from what GI spends to operate the asset.
03 / Capital recovery and contract life
The representative model places payback at 2.9 years within a 25-year customer contract, leaving 22.1 years of contract duration after payback.
Payback does not end GI’s operating costs or maintenance responsibilities. The remaining contract duration is not a guarantee of pure profit or risk-free cash flow.
04 / Project scope
€26,500 is an average / representative project investment. Some projects can be below €10,000; larger projects can be approximately €30,000–€40,000+ depending on the required work.
Illustrative scope variation / Not standardized packages
Heating-system modernization only, with the capital requirement determined by the building.
The current economic model uses €26,500 as its investment reference, not a fixed price across the future portfolio.
Heating infrastructure alongside broader building-envelope or energy-efficiency work where required.
Scope is assessed for each building. Not every project includes every element.
Project discipline
The reference case is a starting point for assessing projects. Building-specific conditions determine the actual economics.
05 / Two sides of the economics
Customer
GI Group
GI’s ownership relates to the heating infrastructure / relevant asset. It does not imply ownership of the public building.
06 / Portfolio logic
Portfolio economics are created by repeating a disciplined project model across multiple operating assets. Scope, demand and operating requirements must be assessed for each project.
These are current reference economics, not results from an operating GI portfolio. Stage 1 is intended to create that operating proof.
See documented traction